Fixed-fee migration assessment: a written plan and estimate in 2 to 3 weeks.

See the assessment

The challenge

Converted pipelines were running in BigQuery, but sign-off needed evidence that each one produced the same results as the legacy warehouse, and an explanation for every difference.

What we did

  1. Checked that each new script reads the right source table
  2. Separated expected differences, like retained history, from real mismatches
  3. Compared the converted code with the original, line by line
  4. Produced client-ready reports where every number can be reproduced by hand

Results

  • Expected differences separated from real defects, so the team fixed only what mattered
  • Validation reports where every number can be reproduced by hand
  • A repeatable check for each migration wave, not a one-off spreadsheet

Let's talk about what you're building.

Tell us what you run today and what needs to change. We reply within two business days, and the first step is a short assessment with a written scope and fixed estimate.

Discuss a project